EU Gas Pipelines — Complete Database
108 EU internal pipelines restored · full intra-European interconnector set in the current dataset
This section now focuses on the complete EU internal pipeline list only, so users can scan every cross-border interconnector, reverse-flow corridor, and strategic redistribution route without the database being diluted by non-EU categories.
EU Internal
108
All intra-EU and connected internal redistribution corridors currently tracked in the dataset.
Operational
102
Pipelines currently usable for live redistribution, balancing, or reverse-flow support.
Under Construction
3
Projects not yet live but relevant for future market integration and resilience planning.
Constrained / Idle
3
Pipelines whose current status limits their role in practical system balancing today.
System-Level Readout
Combined named capacity
1359.8 bcm/yr
Why this matters
These are the corridors that let gas move between member-state markets when storage stress, LNG arrivals, outages, or geopolitical shocks hit one part of Europe harder than another.
Reading tip
Start with status, then route, then operator and strategic context. That sequence usually tells you whether a pipeline is a live balancing tool, a resilience backup, or a politically constrained asset.
All EU Internal Pipelines
EU Internal
Slovakia–Austria Interconnector (Veľké Kapušany–Baumgarten)
Slovakia (Veľké Kapušany) → Slovakia (Bratislava area) → Austria (Baumgarten)
operational
Capacity
70 bcm/yr
Operator
Eustream
Start Endpoint
Slovakia (Veľké Kapušany)
End Endpoint
Austria (Baumgarten)
Strategic Context
Main Eustream transit corridor across Slovakia; historically carried Russian Brotherhood gas; now bidirectional for LNG/Baltic gas redistribution. Baumgarten is EU's largest gas hub
EU Internal
Netherlands TTF Hub Trunk (Gasunie North–South)
Netherlands (Groningen area/Eemskanaal) → Netherlands (Rotterdam/Gate LNG)
operational
Capacity
50 bcm/yr
Operator
Gasunie Transport Services
Start Endpoint
Netherlands (Groningen area/Eemskanaal)
End Endpoint
Netherlands (Rotterdam/Gate LNG)
Strategic Context
Main Gasunie north-south backbone connecting former Groningen field area, Eemshaven FSRU and BBL landing to Rotterdam Gate LNG and onward export to BE/DE
EU Internal
Italy Northern Trunk (SRG North)
Italy (Minerbio/Bologna) → Italy (Milan/Turin)
operational
Capacity
45 bcm/yr
Operator
Snam Rete Gas
Start Endpoint
Italy (Minerbio/Bologna)
End Endpoint
Italy (Milan/Turin)
Strategic Context
Key northern distribution; feeds into Transitgas (Swiss border), SOL (Austrian border), and domestic consumers in Po Valley
EU Internal
Trans Austria Gas Pipeline (TAG)
Austria (Baumgarten) → Italy (Tarvisio)
operational
Capacity
43 bcm/yr
Operator
TAG GmbH
Start Endpoint
Austria (Baumgarten)
End Endpoint
Italy (Tarvisio)
Strategic Context
Historically main route for Russian gas to Italy; now bidirectional
EU Internal
NL–DE Interconnectors (TENP/Bunde)
Netherlands → Germany (multiple border points)
operational
Capacity
40 bcm/yr
Operator
Gasunie / OGE
Start Endpoint
Netherlands
End Endpoint
Germany (multiple border points)
Strategic Context
Multiple pipes via Bunde, Oude Statenzijl, Vlieghuis
EU Internal
UK NTS South–North Trunk
UK (Milford Haven LNG / Bacton) → UK (Moffat/Scotland)
operational
Capacity
40 bcm/yr
Operator
National Gas Transmission
Start Endpoint
UK (Milford Haven LNG / Bacton)
End Endpoint
UK (Moffat/Scotland)
Strategic Context
Main UK National Transmission System trunk connecting southern LNG terminals (Milford Haven, Isle of Grain) and Bacton (BBL/Interconnector) to Scotland and onward to Ireland via Moffat
EU Internal
Czech Republic Břeclav–Waidhaus Transit Trunk
Czech Republic (Břeclav/AT border) → Czech Republic (Waidhaus/DE border)
operational
Capacity
40 bcm/yr
Operator
NET4GAS
Start Endpoint
Czech Republic (Břeclav/AT border)
End Endpoint
Czech Republic (Waidhaus/DE border)
Strategic Context
Main Czech east-west gas transit backbone; connects AT/SK border gas to German MEGAL and onward to France; major bi-directional capacity
EU Internal
Italy Southern Trunk (SRG South)
Italy (Puglia/Taranto) → Italy (Rome/Minerbio)
operational
Capacity
38 bcm/yr
Operator
Snam Rete Gas
Start Endpoint
Italy (Puglia/Taranto)
End Endpoint
Italy (Rome/Minerbio)
Strategic Context
Main south-north backbone carrying TransMed, TAP and Greenstream gas to central Italy; feeds into SRG National Network
EU Internal
Italy Milan–Tarvisio Connector
Italy (Milan) → Italy (Tarvisio/Austrian border)
operational
Capacity
35 bcm/yr
Operator
Snam Rete Gas
Start Endpoint
Italy (Milan)
End Endpoint
Italy (Tarvisio/Austrian border)
Strategic Context
Connects northern industrial belt to TAG/Austrian border; bidirectional flow enabling LNG re-export north
EU Internal
Italy Sicily–Mainland Crossing
Italy (Gela, Sicily) → Italy (Calabria mainland)
operational
Capacity
33.5 bcm/yr
Operator
Snam Rete Gas
Start Endpoint
Italy (Gela, Sicily)
End Endpoint
Italy (Calabria mainland)
Strategic Context
Strait of Messina crossing; carries TransMed Algerian gas + Greenstream Libyan gas from Sicily to mainland
EU Internal
UK East Coast Trunk (Bacton–Grain)
UK (Isle of Grain LNG) → UK (Bacton/BBL-Interconnector)
operational
Capacity
30 bcm/yr
Operator
National Gas Transmission
Start Endpoint
UK (Isle of Grain LNG)
End Endpoint
UK (Bacton/BBL-Interconnector)
Strategic Context
Connects Isle of Grain (Europe's largest LNG terminal) to Bacton gas hub, where BBL pipeline crosses to Netherlands and Interconnector pipe crosses to Belgium
EU Internal
Germany Dornum–Rehden Trunk
Germany (Dornum/Europipe landing) → Germany (Rehden storage) → NL/TENP
operational
Capacity
30 bcm/yr
Operator
GASCADE / OGE
Start Endpoint
Germany (Dornum/Europipe landing)
End Endpoint
NL/TENP
Strategic Context
Critical trunk connecting Norwegian Europipe I/II landfalls at Dornum to Rehden storage hub; from there gas flows south via TENP or west to NL
EU Internal
Interconnector (IUK)
UK (Bacton) → Belgium (Zeebrugge)
operational
Capacity
25.5 bcm/yr
Operator
Interconnector Ltd
Start Endpoint
UK (Bacton)
End Endpoint
Belgium (Zeebrugge)
Strategic Context
Subsea bidirectional pipeline since 1998; one of two UK-continent gas links (other is BBL to NL); key for Northwest European gas balancing
EU Internal
Belgium–France Interconnector (Blaregnies–Taisnières)
Belgium (Blaregnies) → France (Taisnières-sur-Hon)
operational
Capacity
25 bcm/yr
Operator
Fluxys / GRTgaz
Start Endpoint
Belgium (Blaregnies)
End Endpoint
France (Taisnières-sur-Hon)
Strategic Context
Main BE-FR gas interconnector; historically carried Dutch/Norwegian gas into France; bidirectional since 2015; feeds Artère du Nord
EU Internal
Belgium Fluxys South Trunk (Zeebrugge → Blaregnies → FR)
Belgium (Zeebrugge) → Belgium (Maldegem → Ghent → Haaltert → Ath → Blaregnies/FR border)
operational
Capacity
24 bcm/yr
Operator
Fluxys Belgium
Start Endpoint
Belgium (Zeebrugge)
End Endpoint
Blaregnies/FR border)
Strategic Context
Main Belgian gas backbone connecting Zeebrugge LNG hub through Maldegem, Ghent, Haaltert to French border at Blaregnies; carries Norwegian Zeepipe gas and LNG to France via GRTgaz Taisnières
EU Internal
MEGAL Pipeline
Germany (Waidhaus) → France (Medelsheim)
operational
Capacity
23 bcm/yr
Operator
OGE / GRTgaz
Start Endpoint
Germany (Waidhaus)
End Endpoint
France (Medelsheim)
Strategic Context
Major DE-FR gas corridor; bidirectional reverse flow operational
EU Internal
France Fos–Lyon–Paris Trunk (Artère du Rhône)
France (Fos-Cavaou LNG) → France (Lyon → Paris)
operational
Capacity
22 bcm/yr
Operator
GRTgaz
Start Endpoint
France (Fos-Cavaou LNG)
End Endpoint
Paris)
Strategic Context
Main south-north French gas artery; carries Mediterranean LNG from Fos terminals through Rhône Valley to Paris hub and northern grid
EU Internal
TENP (Trans Europa Naturgas Pipeline)
Germany (Aachen/NL border) → Germany (Swiss border, Schwörstadt)
operational
Capacity
21 bcm/yr
Operator
Open Grid Europe
Start Endpoint
Germany (Aachen/NL border)
End Endpoint
Germany (Swiss border, Schwörstadt)
Strategic Context
Major north-south German transit; connects NL gas to Switzerland/Italy via Transitgas
EU Internal
France Dunkirk–Paris Trunk (Artère du Nord)
France (Dunkirk LNG / Taisnières border) → France (Paris)
operational
Capacity
20 bcm/yr
Operator
GRTgaz
Start Endpoint
France (Dunkirk LNG / Taisnières border)
End Endpoint
France (Paris)
Strategic Context
Northern artery connecting Dunkirk LNG, Belgian border gas (Taisnières-Blaregnies), and Norwegian Franpipe landing to Paris distribution
EU Internal
Romania North–South Trunk (Transgaz NTS)
Romania (Isaccea/TR border) → Romania (Bucharest → Mediaș → Csanádpalota/HU border)
operational
Capacity
20 bcm/yr
Operator
Transgaz
Start Endpoint
Romania (Isaccea/TR border)
End Endpoint
Csanádpalota/HU border)
Strategic Context
Main Romanian gas transmission backbone connecting TurkStream landfall at Isaccea through to Bucharest hub, Transylvanian production area at Mediaș, and BRUA corridor to Hungary
EU Internal
Belgium IZT Pipeline (Zeebrugge → NL)
Belgium (Zeebrugge) → Belgium (Zelzate) → Netherlands
operational
Capacity
20 bcm/yr
Operator
Fluxys / Gasunie
Start Endpoint
Belgium (Zeebrugge)
End Endpoint
Netherlands
Strategic Context
Bidirectional interconnector carrying LNG and Norwegian gas north from Zeebrugge hub into Dutch grid; key re-export route for Belgian LNG surplus
EU Internal
France Paris–MEGAL Border Trunk (Artère de l'Est)
France (Paris) → France (Medelsheim/German border)
operational
Capacity
18 bcm/yr
Operator
GRTgaz
Start Endpoint
France (Paris)
End Endpoint
France (Medelsheim/German border)
Strategic Context
Eastern trunk connecting Paris hub to MEGAL crossing at Medelsheim; bidirectional flow enables German gas to reach France and vice versa
EU Internal
Transitgas Pipeline
Italy (Passo Gries) → Switzerland → Germany (Wallbach)
operational
Capacity
17 bcm/yr
Operator
Transitgas AG
Start Endpoint
Italy (Passo Gries)
End Endpoint
Germany (Wallbach)
Strategic Context
Key IT→DE transit via Alps; bidirectional
EU Internal
Bulgaria East–West Trunk (Bulgartransgaz)
Bulgaria (Provadia/TurkStream landing) → Bulgaria (Stara Zagora → Sofia → Dragoman/RS border)
operational
Capacity
17 bcm/yr
Operator
Bulgartransgaz
Start Endpoint
Bulgaria (Provadia/TurkStream landing)
End Endpoint
Dragoman/RS border)
Strategic Context
Main Bulgarian gas backbone carrying TurkStream gas west to Serbia and south to Greece; feeds IGB, IBS and Kulata interconnectors
EU Internal
Troll–Zeebrugge Segment
France (Dunkirk) → Belgium (Zeebrugge)
operational
Capacity
15 bcm/yr
Operator
GRTgaz / Fluxys
Start Endpoint
France (Dunkirk)
End Endpoint
Belgium (Zeebrugge)
Strategic Context
Part of Franpipe landing system into BE grid
EU Internal
BBL Pipeline
Netherlands (Balgzand) → UK (Bacton)
operational
Capacity
15 bcm/yr
Operator
BBL Company
Start Endpoint
Netherlands (Balgzand)
End Endpoint
UK (Bacton)
Strategic Context
Bidirectional subsea since 2006; key NL-UK gas link; reverse flow since 2019
EU Internal
Italy Puglia–Calabria Trunk
Italy (Puglia/TAP landing) → Italy (Calabria for Sicily connection)
operational
Capacity
15 bcm/yr
Operator
Snam Rete Gas
Start Endpoint
Italy (Puglia/TAP landing)
End Endpoint
Italy (Calabria for Sicily connection)
Strategic Context
Southern coastal trunk linking TAP gas to Sicily crossing and southern consumers
EU Internal
France Fos–Swiss Border Trunk
France (Lyon hub) → France/Swiss border (Oltingue)
operational
Capacity
15 bcm/yr
Operator
GRTgaz
Start Endpoint
France (Lyon hub)
End Endpoint
France/Swiss border (Oltingue)
Strategic Context
Eastern French spur connecting Lyon gas hub to Swiss border and onward to Transitgas; enables French LNG re-export to Italy
EU Internal
Belgium Fluxys Antwerp Trunk (Zeebrugge → Antwerp → Loenhout)
Belgium (Zeebrugge) → Belgium (Ghent → Antwerp → Loenhout storage)
operational
Capacity
15 bcm/yr
Operator
Fluxys Belgium
Start Endpoint
Belgium (Zeebrugge)
End Endpoint
Loenhout storage)
Strategic Context
Northern Belgian trunk connecting Zeebrugge hub via Ghent to Antwerp port/petrochemical cluster and Loenhout underground gas storage; critical for winter peak supply
EU Internal
West Austria Gas Pipeline (WAG)
Austria (Baumgarten) → Germany (Oberkappel)
operational
Capacity
14 bcm/yr
Operator
Gas Connect Austria
Start Endpoint
Austria (Baumgarten)
End Endpoint
Germany (Oberkappel)
Strategic Context
Connects Baumgarten hub to Germany; bidirectional since 2022
EU Internal
Austria–Czech Republic Interconnector (Baumgarten–Břeclav)
Austria (Baumgarten) → Czech Republic (Břeclav/Lanžhot)
operational
Capacity
13 bcm/yr
Operator
Gas Connect Austria / NET4GAS
Start Endpoint
Austria (Baumgarten)
End Endpoint
Czech Republic (Břeclav/Lanžhot)
Strategic Context
Part of historical Russian gas transit route; now bidirectional; connects Baumgarten hub to Czech grid and onward to Gazelle/OPAL
EU Internal
Moffat Interconnector (IC1/IC2)
UK (Moffat, Scotland) → Ireland / Northern Ireland
operational
Capacity
12 bcm/yr
Operator
National Gas / GNI
Start Endpoint
UK (Moffat, Scotland)
End Endpoint
Ireland / Northern Ireland
Strategic Context
Unidirectional UK→Ireland; 75% of Ireland's gas imported via this link
EU Internal
Spain Medgaz–East Trunk
Spain (Almería/Medgaz) → Spain (Cartagena → Valencia → Barcelona)
operational
Capacity
12 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Almería/Medgaz)
End Endpoint
Barcelona)
Strategic Context
Mediterranean coast trunk carrying Algerian Medgaz gas and Cartagena LNG east and north; feeds into Barcelona hub
EU Internal
France Montoir–Paris Trunk (Artère de Bretagne)
France (Montoir-de-Bretagne LNG) → France (Paris)
operational
Capacity
12 bcm/yr
Operator
GRTgaz
Start Endpoint
France (Montoir-de-Bretagne LNG)
End Endpoint
France (Paris)
Strategic Context
Western trunk bringing Atlantic LNG import from Montoir (Saint-Nazaire) terminal to the PEG hub and Paris grid
EU Internal
Hungary West–North Trunk (FGSZ M6)
Hungary (Kiskundorozsma/RS border) → Hungary (Budapest) → Hungary (Mosonmagyaróvár/AT border)
operational
Capacity
12 bcm/yr
Operator
FGSZ
Start Endpoint
Hungary (Kiskundorozsma/RS border)
End Endpoint
Hungary (Mosonmagyaróvár/AT border)
Strategic Context
Core Hungarian gas artery connecting TurkStream at Serbian border through Budapest metropolitan area to Austrian border (HAG); feeds domestic consumption and transit
EU Internal
Belgium Fluxys East Trunk (Zeebrugge → Eynatten → DE)
Belgium (Zeebrugge) → Belgium (Maldegem → Evergem/Ghent → Brussels → Liège → Eynatten/German border)
operational
Capacity
12 bcm/yr
Operator
Fluxys Belgium
Start Endpoint
Belgium (Zeebrugge)
End Endpoint
Eynatten/German border)
Strategic Context
Major Belgian transit artery carrying Norwegian (Zeepipe) and LNG gas east through Ghent, Brussels and Liège to German border at Eynatten; feeds into OGE/TENP German grid. Part of NW European gas corridor
EU Internal
Spain Cartagena LNG–Grid Link
Spain (Cartagena LNG) → Spain (main east coast trunk)
operational
Capacity
11.8 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Cartagena LNG)
End Endpoint
Spain (main east coast trunk)
Strategic Context
Connects Cartagena regas terminal to main Mediterranean coast trunk; feeds Valencia and onwards to Barcelona
EU Internal
Zebra Pipeline
Netherlands → Belgium (Zeebrugge)
operational
Capacity
10 bcm/yr
Operator
Fluxys / Gasunie
Start Endpoint
Netherlands
End Endpoint
Belgium (Zeebrugge)
Strategic Context
Cross-border NL–BE via Zelzate
EU Internal
Tarvisio Reverse Flow
Italy → Austria (bidirectional via TAG)
operational
Capacity
10 bcm/yr
Operator
Snam / TAG
Start Endpoint
Italy
End Endpoint
Austria (bidirectional via TAG)
Strategic Context
Reverse capability allows Italy to export LNG-sourced gas northward
EU Internal
WEDAL Pipeline
Germany (Eynatten) → Belgium (Raeren)
operational
Capacity
10 bcm/yr
Operator
OGE / Fluxys
Start Endpoint
Germany (Eynatten)
End Endpoint
Belgium (Raeren)
Strategic Context
German-Belgian border interconnector near Aachen
EU Internal
Spain Huelva–Madrid–Bilbao Trunk
Spain (Huelva LNG) → Spain (Córdoba → Madrid → Bilbao)
operational
Capacity
10 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Huelva LNG)
End Endpoint
Bilbao)
Strategic Context
West-to-north trunk carrying Atlantic LNG and any remaining GME residual supply to central and northern Spain
EU Internal
Germany Wilhelmshaven–Rehden Connector
Germany (Wilhelmshaven FSRUs) → Germany (Rehden storage hub)
operational
Capacity
10 bcm/yr
Operator
OGE / GASCADE
Start Endpoint
Germany (Wilhelmshaven FSRUs)
End Endpoint
Germany (Rehden storage hub)
Strategic Context
Connects new Wilhelmshaven LNG FSRUs (Germany's first, Dec 2022) to Rehden underground storage hub and onward to TENP/NEL grid
EU Internal
Poland Baltic Pipe–Odolanów Trunk
Poland (Niechorze/Baltic Pipe landing) → Poland (Odolanów hub)
operational
Capacity
10 bcm/yr
Operator
GAZ-SYSTEM
Start Endpoint
Poland (Niechorze/Baltic Pipe landing)
End Endpoint
Poland (Odolanów hub)
Strategic Context
Connects Baltic Pipe Norwegian gas landing point at Niechorze to central Polish hub at Odolanów; from there gas flows to SK, CZ borders and domestic consumers
EU Internal
Denmark Baltic Pipe Onshore Section
Denmark (Nybro/North Sea landing) → Denmark (Zealand) → Poland (via offshore)
operational
Capacity
10 bcm/yr
Operator
Energinet / GAZ-SYSTEM
Start Endpoint
Denmark (Nybro/North Sea landing)
End Endpoint
Poland (via offshore)
Strategic Context
Onshore Danish segment of Baltic Pipe routing Norwegian gas from North Sea across Jutland, Little Belt, and Zealand to Poland
EU Internal
Belgium Fluxys Antwerp–Raeren Trunk
Belgium (Antwerp) → Belgium (Hasselt → Raeren/German border)
operational
Capacity
10 bcm/yr
Operator
Fluxys Belgium
Start Endpoint
Belgium (Antwerp)
End Endpoint
Raeren/German border)
Strategic Context
Eastern Belgian trunk connecting Antwerp storage/port area through Limburg province to WEDAL interconnector at Raeren/Eynatten; alternative routing to German grid
EU Internal
France TIGF Southern Link
France (Fos-Cavaou) → France (Toulouse) → France (Larrau/ES border)
operational
Capacity
9 bcm/yr
Operator
Teréga (TIGF)
Start Endpoint
France (Fos-Cavaou)
End Endpoint
France (Larrau/ES border)
Strategic Context
Southern French gas network linking Mediterranean LNG to Toulouse region and Spanish border crossings; feeds Larrau and Biriatou interconnectors
EU Internal
Spain Sagunto LNG–Grid Link
Spain (Sagunto LNG, Valencia) → Spain (main grid)
operational
Capacity
8.8 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Sagunto LNG, Valencia)
End Endpoint
Spain (main grid)
Strategic Context
Connects Sagunto regas terminal near Valencia to the Enagás national grid; one of 7 Spanish terminals
EU Internal
Serbia–Hungary Interconnector (Kiskundorozsma)
Serbia (Horgoš) → Hungary (Kiskundorozsma)
operational
Capacity
8.6 bcm/yr
Operator
Srbijagas / FGSZ
Start Endpoint
Serbia (Horgoš)
End Endpoint
Hungary (Kiskundorozsma)
Strategic Context
Key TurkStream/Balkan Stream onward route to Hungary; bidirectional
EU Internal
Poland Świnoujście–Odolanów Trunk
Poland (Świnoujście LNG) → Poland (Szczecin → Poznań → Odolanów)
operational
Capacity
8.3 bcm/yr
Operator
GAZ-SYSTEM
Start Endpoint
Poland (Świnoujście LNG)
End Endpoint
Odolanów)
Strategic Context
Main Polish LNG distribution trunk carrying Baltic LNG from Świnoujście south to central Poland and onward to SK/CZ borders via interconnectors
EU Internal
Adria-Wien Pipeline (AWP)
Austria (Arnoldstein/IT border) → Austria (Vienna/Baumgarten)
operational
Capacity
8 bcm/yr
Operator
Gas Connect Austria
Start Endpoint
Austria (Arnoldstein/IT border)
End Endpoint
Austria (Vienna/Baumgarten)
Strategic Context
Connects TAG/Italian gas to Vienna hub; part of Adriatic gas corridor
EU Internal
Spain Barcelona–Larrau Link (ENAGAS Central)
Spain (Barcelona) → Spain (Zaragoza) → France (Larrau)
operational
Capacity
8 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Barcelona)
End Endpoint
France (Larrau)
Strategic Context
Central trunk connecting Barcelona LNG hub and east coast gas to western Pyrenees crossing (Larrau FR-ES interconnector)
EU Internal
Greece South–North Trunk (DESFA Main)
Greece (Revithoussa LNG, Athens) → Greece (Thessaloniki) → Greece (Nea Mesimvria/TAP)
operational
Capacity
8 bcm/yr
Operator
DESFA
Start Endpoint
Greece (Revithoussa LNG, Athens)
End Endpoint
Greece (Nea Mesimvria/TAP)
Strategic Context
Main Greek gas backbone connecting Revithoussa LNG near Athens to the northern grid; feeds IGB to Bulgaria at Komotini and Kulata crossing
EU Internal
Belgium–Netherlands Interconnector (Hilvarenbeek–Poppel)
Netherlands (Hilvarenbeek) → Belgium (Poppel)
operational
Capacity
8 bcm/yr
Operator
Gasunie / Fluxys
Start Endpoint
Netherlands (Hilvarenbeek)
End Endpoint
Belgium (Poppel)
Strategic Context
Eastern NL-BE border crossing; complements Zebra pipeline on western side; carries Dutch gas/Norwegian transit into Belgian grid
EU Internal
Portugal Sines–Campo Maior Trunk
Portugal (Sines LNG) → Portugal (Lisbon) → Portugal (Campo Maior/Spanish border)
operational
Capacity
7.6 bcm/yr
Operator
REN Gasodutos
Start Endpoint
Portugal (Sines LNG)
End Endpoint
Portugal (Campo Maior/Spanish border)
Strategic Context
Main Portuguese gas artery carrying Sines LNG import east to Spanish border at Campo Maior; bidirectional interconnector with Enagás
EU Internal
SOL Pipeline (Snam South)
Italy → Austria via Brenner / Gorizia
operational
Capacity
7 bcm/yr
Operator
Snam / Gas Connect Austria
Start Endpoint
Italy
End Endpoint
Austria via Brenner / Gorizia
Strategic Context
Allows Italian LNG excess to flow north to Austria
EU Internal
Spain Barcelona–Biriatou Link
Spain (Barcelona) → Spain (Bilbao) → France (Biriatou)
operational
Capacity
7 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Barcelona)
End Endpoint
France (Biriatou)
Strategic Context
Northern trunk connecting Barcelona hub and Bilbao LNG to Atlantic coast FR-ES crossing; feeds Basque industrial zone
EU Internal
Poland Odolanów–Strachocina South Trunk
Poland (Odolanów) → Poland (Strachocina/SK border)
operational
Capacity
7 bcm/yr
Operator
GAZ-SYSTEM
Start Endpoint
Poland (Odolanów)
End Endpoint
Poland (Strachocina/SK border)
Strategic Context
Southern trunk connecting central Polish hub to PL-SK interconnector at Strachocina and onward to Cieszyn (PL-CZ) border
EU Internal
Spain Bilbao LNG–Grid Link
Spain (Bilbao LNG) → Spain (Basque grid / Huelva–Madrid trunk)
operational
Capacity
7 bcm/yr
Operator
Enagás / BBG
Start Endpoint
Spain (Bilbao LNG)
End Endpoint
Spain (Basque grid / Huelva–Madrid trunk)
Strategic Context
Connects Bahía de Bizkaia Bilbao LNG terminal to Basque Country gas grid; feeds Biriatou interconnector to France
EU Internal
Poland–Czech Republic Interconnector (Stork II)
Poland (Cieszyn) → Czech Republic (Český Těšín)
operational
Capacity
6.5 bcm/yr
Operator
GAZ-SYSTEM / NET4GAS
Start Endpoint
Poland (Cieszyn)
End Endpoint
Czech Republic (Český Těšín)
Strategic Context
Upgraded 2022; links Polish Baltic LNG corridor to Czech grid
EU Internal
Greece Thessaloniki–Komotini–TAP Pipeline
Greece (Thessaloniki) → Greece (Komotini/TAP-IGB junction)
operational
Capacity
6 bcm/yr
Operator
DESFA
Start Endpoint
Greece (Thessaloniki)
End Endpoint
Greece (Komotini/TAP-IGB junction)
Strategic Context
Northern Greek trunk connecting Thessaloniki to Thrace; meets TAP at Kipoi and feeds IGB to Bulgaria from Komotini junction
EU Internal
Hungary South–East Trunk (FGSZ BRUA)
Hungary (Csanádpalota/RO border) → Hungary (Budapest)
operational
Capacity
6 bcm/yr
Operator
FGSZ
Start Endpoint
Hungary (Csanádpalota/RO border)
End Endpoint
Hungary (Budapest)
Strategic Context
Eastern arm of Hungarian grid connecting BRUA Romanian gas and Caspian corridor to Budapest hub; part of N-S Gas Corridor
EU Internal
Ireland GNI National Trunk
Ireland (Dublin/Gormanston landing) → Ireland (Cork/Limerick/Galway)
operational
Capacity
6 bcm/yr
Operator
Gas Networks Ireland
Start Endpoint
Ireland (Dublin/Gormanston landing)
End Endpoint
Ireland (Cork/Limerick/Galway)
Strategic Context
Main Irish gas transmission ring connecting Moffat import pipeline landing at Dublin to Cork industrial hub and Shannon-Foynes LNG terminal site
EU Internal
Poland–Slovakia Interconnector
Poland (Strachocina) → Slovakia (Veľké Kapušany)
operational
Capacity
5.7 bcm/yr
Operator
GAZ-SYSTEM / Eustream
Start Endpoint
Poland (Strachocina)
End Endpoint
Slovakia (Veľké Kapušany)
Strategic Context
Operational 2022; major N-S Gas Corridor project
EU Internal
Larrau Interconnector
Spain → France (Larrau, Pyrénées)
operational
Capacity
5.5 bcm/yr
Operator
Enagás / Teréga
Start Endpoint
Spain
End Endpoint
France (Larrau, Pyrénées)
Strategic Context
Western Pyrenees crossing; one of two FR-ES gas interconnectors
EU Internal
Greece Alexandroupolis–Komotini Link
Greece (Alexandroupolis FSRU) → Greece (Komotini)
operational
Capacity
5.5 bcm/yr
Operator
DESFA / Gastrade
Start Endpoint
Greece (Alexandroupolis FSRU)
End Endpoint
Greece (Komotini)
Strategic Context
Connects new Alexandroupolis FSRU (operational 2024) to the main Greek grid at Komotini and into IGB for Bulgaria/SE Europe
EU Internal
Germany–Poland Interconnector (Mallnow–Lwówek)
Germany (Mallnow/Frankfurt Oder) → Poland (Lwówek)
operational
Capacity
5.5 bcm/yr
Operator
GASCADE / GAZ-SYSTEM
Start Endpoint
Germany (Mallnow/Frankfurt Oder)
End Endpoint
Poland (Lwówek)
Strategic Context
Bidirectional DE-PL gas interconnector at Oder River border; part of GCP (Gas Corridor Poland); links German OPAL/NEL system to Polish grid
EU Internal
Hungary–Slovakia Interconnector
Hungary → Slovakia (Veľké Zlievce)
operational
Capacity
5 bcm/yr
Operator
FGSZ / Eustream
Start Endpoint
Hungary
End Endpoint
Slovakia (Veľké Zlievce)
Strategic Context
Bidirectional; part of N-S Gas Corridor
EU Internal
Spain Atlantic Coast Trunk
Spain (Mugardos LNG, Galicia) → Spain (Bilbao LNG)
operational
Capacity
5 bcm/yr
Operator
Enagás
Start Endpoint
Spain (Mugardos LNG, Galicia)
End Endpoint
Spain (Bilbao LNG)
Strategic Context
Atlantic coast connector linking NW Spain LNG import to Basque Country hub
EU Internal
Germany Brunsbüttel–Hamburg Link
Germany (Brunsbüttel FSRU) → Germany (Hamburg grid)
operational
Capacity
5 bcm/yr
Operator
OGE / Gasunie DE
Start Endpoint
Germany (Brunsbüttel FSRU)
End Endpoint
Germany (Hamburg grid)
Strategic Context
Links Brunsbüttel emergency FSRU on Elbe estuary to Hamburg metropolitan gas grid and onward distribution south
EU Internal
Italy Piombino FSRU–Grid Link
Italy (Piombino FSRU, Tuscany) → Italy (central Italian grid)
operational
Capacity
5 bcm/yr
Operator
Snam
Start Endpoint
Italy (Piombino FSRU, Tuscany)
End Endpoint
Italy (central Italian grid)
Strategic Context
Connects Golar Tundra FSRU at Piombino port to Snam national grid; operational mid-2023; feeds central Italian demand
EU Internal
Italy Ravenna FSRU–Grid Link
Italy (Ravenna FSRU, Adriatic) → Italy (Minerbio hub)
operational
Capacity
5 bcm/yr
Operator
Snam
Start Endpoint
Italy (Ravenna FSRU, Adriatic)
End Endpoint
Italy (Minerbio hub)
Strategic Context
Connects BW Singapore FSRU offshore Ravenna to the Minerbio storage/distribution hub; operational 2024
EU Internal
OAL Pipeline (Ostseeanbindungsleitung)
Germany (Mukran FSRU, Rügen) → German grid (Lubmin area)
operational
Capacity
4.5 bcm/yr
Operator
GASCADE
Start Endpoint
Germany (Mukran FSRU, Rügen)
End Endpoint
German grid (Lubmin area)
Strategic Context
New 2024; connects Mukran FSRU to onshore grid at former Nord Stream landing
EU Internal
Portugal–Spain Interconnector (Campo Maior–Badajoz)
Portugal (Campo Maior) → Spain (Badajoz)
operational
Capacity
4.5 bcm/yr
Operator
REN / Enagás
Start Endpoint
Portugal (Campo Maior)
End Endpoint
Spain (Badajoz)
Strategic Context
Bidirectional PT-ES border crossing near Badajoz; carries Portuguese LNG re-exports into Spanish grid
EU Internal
Romania–Hungary Interconnector (BRUA Phase 1)
Romania → Hungary (Csanádpalota)
operational
Capacity
4.4 bcm/yr
Operator
Transgaz / FGSZ
Start Endpoint
Romania
End Endpoint
Hungary (Csanádpalota)
Strategic Context
Part of BRUA corridor; connects Black Sea gas to Central Europe
EU Internal
HAG Pipeline (Hungary–Austria Gasleitung)
Hungary (Mosonmagyaróvár) → Austria (Baumgarten)
operational
Capacity
4.4 bcm/yr
Operator
FGSZ / Gas Connect Austria
Start Endpoint
Hungary (Mosonmagyaróvár)
End Endpoint
Austria (Baumgarten)
Strategic Context
Bidirectional HU-AT link; enables Hungarian gas from TurkStream/BRUA corridor to reach Baumgarten hub; key Central European connector
EU Internal
Latvia–Lithuania Interconnector
Latvia → Lithuania (Kiemėnai)
operational
Capacity
4 bcm/yr
Operator
Conexus / Amber Grid
Start Endpoint
Latvia
End Endpoint
Lithuania (Kiemėnai)
Strategic Context
Part of integrated Baltic gas market since 2022
EU Internal
Germany–Denmark Interconnector (Ellund)
Germany → Denmark (Ellund/Frøslev)
operational
Capacity
4 bcm/yr
Operator
OGE / Energinet
Start Endpoint
Germany
End Endpoint
Denmark (Ellund/Frøslev)
Strategic Context
Bidirectional; part of Baltic Pipe southern connection
EU Internal
Lithuania Klaipėda–Vilnius Trunk
Lithuania (Klaipėda FSRU) → Lithuania (Vilnius) → Poland border (GIPL)
operational
Capacity
4 bcm/yr
Operator
Amber Grid
Start Endpoint
Lithuania (Klaipėda FSRU)
End Endpoint
Poland border (GIPL)
Strategic Context
Main Lithuanian gas trunk connecting Independence FSRU at Klaipėda east through country to Vilnius and GIPL connection to Poland; Baltic energy security backbone
EU Internal
Finland Inkoo FSRU–Grid Link
Finland (Inkoo FSRU) → Finland (main grid / Balticconnector)
operational
Capacity
4 bcm/yr
Operator
Gasgrid Finland
Start Endpoint
Finland (Inkoo FSRU)
End Endpoint
Finland (main grid / Balticconnector)
Strategic Context
Connects Exemplar FSRU at Inkoo to Finnish gas grid and shared Balticconnector link to Estonia; replaced Russian Imatra border gas
EU Internal
Biriatou Interconnector
Spain → France (Biriatou, Basque Country)
operational
Capacity
3.5 bcm/yr
Operator
Enagás / Teréga
Start Endpoint
Spain
End Endpoint
France (Biriatou, Basque Country)
Strategic Context
Atlantic coast FR-ES connection
EU Internal
Interconnector Greece-Bulgaria (IGB)
Greece (Komotini) → Bulgaria (Stara Zagora)
operational
Capacity
3 bcm/yr
Operator
ICGB AD
Start Endpoint
Greece (Komotini)
End Endpoint
Bulgaria (Stara Zagora)
Strategic Context
Operational Oct 2022; expanding to 5 bcm; connects TAP gas to Bulgaria
EU Internal
Estonia–Latvia Interconnector
Estonia (Karksi) → Latvia
operational
Capacity
3 bcm/yr
Operator
Elering / Conexus
Start Endpoint
Estonia (Karksi)
End Endpoint
Latvia
Strategic Context
Bidirectional; connects Baltic gas market
EU Internal
Bulgaria–Greece Interconnector (Kulata)
Bulgaria (Kulata) → Greece (Sidirokastro)
operational
Capacity
3 bcm/yr
Operator
Bulgartransgaz / DESFA
Start Endpoint
Bulgaria (Kulata)
End Endpoint
Greece (Sidirokastro)
Strategic Context
Part of Vertical Gas Corridor; expanded capacity for TurkStream/TAP gas
EU Internal
Denmark–Sweden Interconnector (Dragør)
Denmark (Dragør, Zealand) → Sweden (Malmö/Trelleborg)
operational
Capacity
3 bcm/yr
Operator
Energinet / Swedegas
Start Endpoint
Denmark (Dragør, Zealand)
End Endpoint
Sweden (Malmö/Trelleborg)
Strategic Context
Subsea Øresund crossing providing Sweden's sole gas import; feeds western Sweden gas grid
EU Internal
Croatia–Hungary Interconnector
Croatia (Slobodnica) → Hungary (Drávaszerdahely)
operational
Capacity
2.9 bcm/yr
Operator
Plinacro / FGSZ
Start Endpoint
Croatia (Slobodnica)
End Endpoint
Hungary (Drávaszerdahely)
Strategic Context
Connects LNG Croatia (Krk) to Hungarian grid
EU Internal
Krk LNG FSRU Connection
Krk Island FSRU → Croatian grid (Omišalj)
operational
Capacity
2.9 bcm/yr
Operator
LNG Croatia
Start Endpoint
Krk Island FSRU
End Endpoint
Croatian grid (Omišalj)
Strategic Context
FSRU since Jan 2021; expansion to 6.1 bcm by 2027
EU Internal
Croatia Krk–Slobodnica Trunk
Croatia (Krk FSRU) → Croatia (Zagreb area) → Croatia (Slobodnica/HU border)
operational
Capacity
2.9 bcm/yr
Operator
Plinacro
Start Endpoint
Croatia (Krk FSRU)
End Endpoint
Croatia (Slobodnica/HU border)
Strategic Context
National trunk carrying Krk LNG from Adriatic coast through Zagreb to Slobodnica, feeding HR-HU interconnector for Hungarian grid
EU Internal
Balticconnector
Finland (Inkoo) → Estonia (Paldiski)
operational
Capacity
2.6 bcm/yr
Operator
Gasgrid Finland / Elering
Start Endpoint
Finland (Inkoo)
End Endpoint
Estonia (Paldiski)
Strategic Context
Subsea; damaged Oct 2023 by anchor drag, repaired Apr 2024
EU Internal
Slovenia Internal Gas Trunk (M1/M2)
Slovenia (Rogatec/HR border) → Slovenia (Ljubljana) → Slovenia (Ceršak/AT border)
operational
Capacity
2.5 bcm/yr
Operator
Plinovodi
Start Endpoint
Slovenia (Rogatec/HR border)
End Endpoint
Slovenia (Ceršak/AT border)
Strategic Context
Main Slovenian gas backbone connecting Croatian import at Rogatec through capital Ljubljana to Austrian border at Ceršak and Italian border at Šempeter
EU Internal
Germany–Poland Interconnector (Lasów)
Germany (Gubin) → Poland (Lasów)
operational
Capacity
2.5 bcm/yr
Operator
OGE / GAZ-SYSTEM
Start Endpoint
Germany (Gubin)
End Endpoint
Poland (Lasów)
Strategic Context
Southern DE-PL border crossing near Lusatia; bidirectional capacity for regional supply balancing
EU Internal
Gas Interconnection Poland–Lithuania (GIPL)
Poland (Hołowczyce) → Lithuania (Jauniūnai)
operational
Capacity
2.4 bcm/yr
Operator
GAZ-SYSTEM / Amber Grid
Start Endpoint
Poland (Hołowczyce)
End Endpoint
Lithuania (Jauniūnai)
Strategic Context
Operational May 2022; ends Baltic isolation from EU gas grid
EU Internal
Slovenia–Austria Interconnector (Ceršak–Murfeld)
Slovenia (Ceršak) → Austria (Murfeld/Spielfeld)
operational
Capacity
2.2 bcm/yr
Operator
Plinovodi / Gas Connect Austria
Start Endpoint
Slovenia (Ceršak)
End Endpoint
Austria (Murfeld/Spielfeld)
Strategic Context
Northern SI-AT border crossing connecting Slovenian grid to Austrian southern gas network; bidirectional
EU Internal
Slovenia–Italy Interconnector (Šempeter–Gorizia)
Slovenia (Šempeter pri Gorici) → Italy (Gorizia)
operational
Capacity
2 bcm/yr
Operator
Plinovodi / Snam
Start Endpoint
Slovenia (Šempeter pri Gorici)
End Endpoint
Italy (Gorizia)
Strategic Context
Western SI-IT border crossing; enables bidirectional gas trade; connects Slovenian grid to northeast Italian network
EU Internal
Slovenia–Croatia Interconnector (Rogatec)
Croatia (Zagreb grid) → Slovenia (Rogatec border)
operational
Capacity
2 bcm/yr
Operator
Plinacro / Plinovodi
Start Endpoint
Croatia (Zagreb grid)
End Endpoint
Slovenia (Rogatec border)
Strategic Context
Southern border crossing connecting Croatian gas supply to Slovenian grid; historically SI's primary gas import route
EU Internal
Belgium Fluxys Luxembourg Spur (Brussels → Bras → LUX)
Belgium (Brussels) → Belgium (Namur → Bras) → Luxembourg (Pétange)
operational
Capacity
2 bcm/yr
Operator
Fluxys Belgium
Start Endpoint
Belgium (Brussels)
End Endpoint
Luxembourg (Pétange)
Strategic Context
Southern Belgian spur branching off main trunk near Namur toward Luxembourg border at Bras; sole gas supply route for Luxembourg
EU Internal
Sweden West Coast Gas Trunk
Sweden (Malmö/DK interconnector) → Sweden (Gothenburg)
operational
Capacity
2 bcm/yr
Operator
Swedegas / Nordion Energi
Start Endpoint
Sweden (Malmö/DK interconnector)
End Endpoint
Sweden (Gothenburg)
Strategic Context
Sweden's only gas transmission pipeline; west coast trunk from Danish import at Malmö to Gothenburg; serves Hallingsäll/Stenungsund industry
EU Internal
Bulgaria–Serbia Interconnector (IBS)
Bulgaria (Dragoman) → Serbia (Niš area)
operational
Capacity
1.8 bcm/yr
Operator
Bulgartransgaz / Srbijagas
Start Endpoint
Bulgaria (Dragoman)
End Endpoint
Serbia (Niš area)
Strategic Context
Connects TurkStream corridor to Serbian grid
EU Internal
Bulgaria–Romania Interconnector
Bulgaria (Ruse) → Romania (Giurgiu)
operational
Capacity
1.5 bcm/yr
Operator
Bulgartransgaz / Transgaz
Start Endpoint
Bulgaria (Ruse)
End Endpoint
Romania (Giurgiu)
Strategic Context
Danube crossing; reverse flow capability since 2020
EU Internal
Iași–Ungheni–Chișinău Pipeline
Romania (Iași) → Moldova (Ungheni → Chișinău)
operational
Capacity
1.5 bcm/yr
Operator
Transgaz / Vestmoldtransgaz
Start Endpoint
Romania (Iași)
End Endpoint
Chișinău)
Strategic Context
Operational 2022; breaks Moldova's 100% Russian gas dependency
EU Internal
Belgium–Luxembourg Interconnector (Bras–Pétange)
Belgium (Bras) → Luxembourg (Pétange)
operational
Capacity
1.5 bcm/yr
Operator
Fluxys / Creos Luxembourg
Start Endpoint
Belgium (Bras)
End Endpoint
Luxembourg (Pétange)
Strategic Context
Sole gas interconnector supplying Luxembourg from the Belgian grid; critical for LUX gas supply security
EU Internal
France–Luxembourg Interconnector (Duzey–Pétange)
France (Duzey) → Luxembourg (Pétange)
operational
Capacity
1 bcm/yr
Operator
GRTgaz / Creos Luxembourg
Start Endpoint
France (Duzey)
End Endpoint
Luxembourg (Pétange)
Strategic Context
Secondary LUX gas supply from French grid; part of bilateral FR-LU energy cooperation
EU Internal
Luxembourg–Germany Interconnector (Remich)
Luxembourg (Remich) → Germany (Perl/Saarland)
operational
Capacity
1 bcm/yr
Operator
Creos Luxembourg / OGE
Start Endpoint
Luxembourg (Remich)
End Endpoint
Germany (Perl/Saarland)
Strategic Context
Eastern LUX border crossing to German grid; bidirectional; provides redundancy alongside BE/FR supply
EU Internal
Midcat / STEP H2Ready
Spain (Barcelona) → France (Barbaira)
under-construction
Capacity
7 bcm/yr
Operator
Enagás / Teréga
Start Endpoint
Spain (Barcelona)
End Endpoint
France (Barbaira)
Strategic Context
BarMar/STEP: H2-ready subsea link Barcelona–Marseille announced 2022; first phase 2028
EU Internal
Romania Black Sea–Podișor Trunk (BRUA Phase 2)
Romania (Black Sea offshore landing) → Romania (Podișor → Recaș)
under-construction
Capacity
4 bcm/yr
Operator
Transgaz
Start Endpoint
Romania (Black Sea offshore landing)
End Endpoint
Recaș)
Strategic Context
New onshore trunk connecting Neptun Deep Black Sea gas field (Romgaz/OMV Petrom) to Romanian NTS; expected 2027; critical for EU gas autonomy
EU Internal
Greece–North Macedonia Interconnector
Greece (Nea Mesimvria) → North Macedonia (Gevgelija/Negotino)
under-construction
Capacity
1.5 bcm/yr
Operator
DESFA / GA-MA
Start Endpoint
Greece (Nea Mesimvria)
End Endpoint
North Macedonia (Gevgelija/Negotino)
Strategic Context
EU PCI; delayed repeatedly; connects Revithoussa LNG to N. Macedonia; target 2026
EU Internal
OPAL (Ostsee Pipeline Anbindungsleitung)
Germany (Greifswald) → Czech border (Olbernhau)
idle
Capacity
36 bcm/yr
Operator
OPAL Gastransport
Start Endpoint
Germany (Greifswald)
End Endpoint
Czech border (Olbernhau)
Strategic Context
Built for Nord Stream landing; largely idle since NS destruction
EU Internal
Gazelle Pipeline
Czech Republic (Hora Sv. Kateřiny) → Germany (Waidhaus)
idle
Capacity
30 bcm/yr
Operator
NET4GAS
Start Endpoint
Czech Republic (Hora Sv. Kateřiny)
End Endpoint
Germany (Waidhaus)
Strategic Context
Czech transit segment for Nord Stream gas; idle since 2022
EU Internal
NEL Pipeline (Nordeuropäische Erdgasleitung)
Germany (Greifswald) → Germany (Rehden)
idle
Capacity
20 bcm/yr
Operator
NEL Gastransport
Start Endpoint
Germany (Greifswald)
End Endpoint
Germany (Rehden)
Strategic Context
Built for Nord Stream 1 gas distribution westward; largely idle since NS destruction